TIEN SON INDUSTRIAL PARK - BAC NINH PROVINCE

“Stereotype industrial park in the North of Vietnam”

Total Area: 350ha 

The Industrial Park was occupied 100%

Operation Time:

  • Phase 1: 1999 – 2049
  • Phase 2: 2006 – 2056

Advantages of the Industrial Park:

  1. Convenient location, located right between National Road 1A and National Road 1B
  2. Adequate and synchronous technical, service and social infrastructure
  3. Dormitory and Villa for lease
  4. The leveling altitude is 5m and higher

Tien Son IP is located between National Road 1A and National Road 1B (Lang Son – Hanoi – HCMC).

Traffic

Tien Son IP is located between National Road 1A and National Road 1B (Lang Son – Hanoi – HCMC).

Technical Infrastructure

Power supply station

Power is supplied from national grid through 110/22KV (35KV) transformer station with capacity of 1x40MVA and 1 x 63 MVA.

Water supply station

Water treatment station with the first phase capacity of 7,000m3/day.

Telecommunication system

Telecommunication system reaches the international standard 

Wastewater treatment

Waste water treatment station with the capacity of 4,000 m3/day.

SERVICES

Police station

Logistics center

Bank

Polyclinic

Gas supply station

Post office

Social Infrastructure

Tien Son Urban Area with scale of 24 ha located right next to the Industrial Park to provide housing for experts and workers and other utilities such as: restaurant, sport area,...

 

  • Taxation of corporate income tax rate is 20%.
  • Exempt CIT for the first 2 years
  • Decrease 50% for the next 4 years
TOP