ViglaceraIP

T: +84 888 252 288
  • Tiếng Việt
  • English
  • 한국어
  • 简体中文
  • 日本語
  • About us
    About us
    Main business
    • Building Materials
    • Real Estates
    International Cooperation
    Achievement & Awards
    Gallery
  • Project

    Project

    Industrial Parks
    Yen Phong
    Yen Phong 2C
    Tien Son
    Thuan Thanh Eco-Smart IP
    Song Cong 2 IP - Phase 2
    Dong Mai
    Hai Yen
    Phu Ha
    Phong Dien
    Tran Yen IP - Phase 1
    Dong Van 4
    Yen My
    Doc Da Trang
    Tien Hai
    ViMariel

    Factories for lease

    Housing project for workers

  • Investment Guide
    • Investment Guide
  • Advantages
  • News
  • Contact Us

The First Five Stations Commencing Construction on the Lao Cai – Hanoi – Hai Phong Railway Line

by Viglacera IP / Wednesday, 14 January 2026 / Published in News

On December 19, together with other projects nationwide, the groundbreaking ceremony for Sub-project 1 of the Investment Project for the Construction of the Lao Cai – Hanoi – Hai Phong Railway Line was held simultaneously at six locations, with the main venue in Lao Cai Province.

At Lao Cai Station (Dong Pho Moi Industrial Park, Lao Cai Ward, Lao Cai Province), the Ministry of Construction organized the groundbreaking ceremony for Sub-project 1 of the Investment Project for the Construction of the Lao Cai – Hanoi – Hai Phong Railway Line. At the same time, the ceremony was held concurrently at other locations, including Phu Tho Station (Phu Tho Province – adjacent to Phu Ha Industrial Park), Bac Hong Station (Hanoi City), Luong Tai Station (Hung Yen Province), and Hai Duong Nam Station (Hai Phong City).

The Investment Project for the Construction of the Lao Cai – Hanoi – Hai Phong Railway Line was approved in principle by the National Assembly under Resolution No. 187/2025/NQ-QH dated February 19, 2025, with a preliminary total investment of VND 203,231 billion. The project passes through six provinces and cities: Lao Cai, Phu Tho, Hanoi, Bac Ninh, Hung Yen, and Hai Phong.

The project has a total mainline length of approximately 390.9 km and branch lines totaling approximately 27.9 km, using a single-track standard gauge of 1,435 mm, applying rail-based railway technology, and serving both passenger and freight transportation. The design speed is 160 km/h for the mainline section from New Lao Cai Station to Nam Hai Phong Station; 120 km/h for the section passing through the Hanoi metropolitan hub area; and 80 km/h for the remaining sections.

Recent Posts

  • Deputy Prime Minister commends Viglacera (VGC) project for helping Cuba attract international investors

    This is the first time-limited concession proje...
  • Viglacera Hung Yen approved as developer for No. 01 Industrial Park– Phase 1

    On the morning of October 8, Mr. Nguyen Khac Th...
  • Noble Acts in Times of Hardship

    On October 17, GELEX Group and its member compa...
  • Transparency in access to social housing

    Social housing has long been the dream of many ...
  • Groundbreaking Ceremony of Tien Duong 1 Social Housing Project (Commercial Name: Tien Duong Park City)

    On December 19, 2025, in a solemn atmosphere, g...

VIGLACERA REAL ESTATE COMPANY
Office: 2nd Floor, Viglacera Tower, No. 1 Thang Long Boulevard, Dai Mo Ward, Hanoi
E-mail: vir@viglaceraland.vn | Fax: (+84-24) 3553 7666 | Tel: (+84-24) 3553 6688
Website: www.viglaceraip.com

HOTLINE
+84 888252288 | +84 987708387
+84 903405099 | +84 888692288

© 2017-2025 Viglacera. All rights reserved. Designed by INNOCOM.

TOP

Zalo
Phone
All in one