

Total area: 409 ha
Operational Period: 2026 – 2076
Advantages:
Advantages:

- Road: Adjacent to Au Co - Doan Hung Road (318C), connecting directly to Noi Bai - Lao Cai Highway via interchanges No. 7 and No. 9.
+ To Noi Bai International Airport: 50 minutes
+ To Ha Noi: 1h10 minutes
+ To Lao Cai Border Gate: 3 hours
- Railway: Located near the Lao Cai - Hanoi - Hai Phong high-speed railway (Commenced in December 2025).
+ To Phu Tho Station: 10 minutes
+ To Ha Noi: 30 minutes
+ To Lao Cai Border Gate: 1h30 minutes
+ To Hai Phong Port: 1h30 minutes
- Waterway:
+ To An Dao Inland Port (capacity up to 3,000 tons): 15 minutes
Phu Ninh Industrial Park offers multimodal connectivity (Road - Railway - Waterway), located at the hub connecting the Northern Industrial Belt and China.


Power Supply: Power is supplied from the national grid via 110/22kV substations (Phu Ninh 3 substation with a capacity of 3 x 63 MVA and Phu Ninh 2 substation with a capacity of 2 x 40 MVA)

Water supply station with a capacity of 9,200 m³/day

Modern wastewater treatment plant with a capacity of 6,500 m³/day. Rainwater and wastewater drainage systems are built separately

Modern information system meeting international standards and fully capable of high-speed data services
IP parking lot and internal security team
Close to Regional General Hospital (15km), Provincial General Hospital (20km), Vietcombank, and the Customs office located at the administrative center of Phu Tho province






Phu Ha Urban Area is 8km away from the Industrial Park


