ViglaceraIP

T: +84 888 252 288
  • Tiếng Việt
  • English
  • 한국어
  • 简体中文
  • 日本語
  • About us
    About us
    Main business
    • Building Materials
    • Real Estates
    International Cooperation
    Achievement & Awards
    Gallery
  • Project

    Project

    Industrial Parks
    Yen Phong
    Yen Phong 2C
    Tien Son
    Thuan Thanh Eco-Smart IP
    Song Cong 2 IP - Phase 2
    Dong Mai
    Hai Yen
    Phu Ha
    Phong Dien
    Tran Yen IP - Phase 1
    Phu Ninh
    Dong Van 4
    Yen My
    Doc Da Trang
    Tien Hai
    Green One
    ViMariel

    Factories for lease

    Housing project for workers

  • Investment Guide
    • Investment Guide
  • Advantages
  • News
  • Contact Us

Planning for 187-km Hai Phong – Ha Long – Mong Cai Railway

by Viglacera IP / Friday, 30 October 2026 / Published in News

The Ministry of Construction announced that the Hai Phong – Ha Long – Mong Cai railway line, spanning approximately 187 km, is currently undergoing detailed planning and a pre-feasibility study.

Responding to petitions from voters in Quang Ninh Province regarding the implementation of the railway connecting with China, the Ministry of Construction stated that the Railway Network Master Plan for the 2021–2030 Period, with a Vision to 2050, identifies the Hai Phong – Ha Long – Mong Cai railway line as approximately 187 km long. The line originates at Nam Dinh Vu Station in Hai Phong and terminates in the Mong Cai area, Quang Ninh Province.

The railway is planned to utilize a standard 1,435 mm gauge, feature electrification, and undergo investment studies during the 2021–2030 period.

Currently, transportation along the Hai Phong – Ha Long – Mong Cai corridor is handled via road and waterway routes. Among these, freight is predominantly transported by inland waterways and coastal shipping due to lower logistics costs, while passenger transit is mainly served by roads. The Ha Long – Mong Cai Expressway is currently operating with 4 lanes and is assessed to be capable of meeting passenger transport demand through 2040. Current traffic volume on the expressway is approximately 9,000 PCUs (passenger car units), equivalent to 20% of its designed capacity.

Ha Long Ward, Quang Ninh Province seen from above
Ha Long Ward, Quang Ninh Province seen from above.

The Ministry of Construction noted that once passenger and freight transport demand reaches a sufficient scale, investment in the Hai Phong – Ha Long – Mong Cai railway will be carried out. In the immediate future, priority will remain on maritime and river transport for freight to keep logistics costs down, while road networks continue to accommodate the majority of passenger travel demand.

Regarding investment preparation, in accordance with agreements between Vietnam and China along with directives from the Government, the Ministry of Construction has directed the Vietnam Railway Authority to coordinate with relevant Chinese authorities to formulate the Detailed Plan for the Hai Phong – Ha Long – Mong Cai railway line, with completion slated for 2026.

Recent Posts

  • Viglacera commences construction of the Tay Pho Yen Industrial Park – Phase 1, covering 499 hectares, in Thai Nguyen province.

    On October 29, 2026, in Thai Nguyen, amidst the...
  • Quang Ninh Prepares for Investment in New Expressway

    To enhance inter-regional and intra-regional co...
  • From September 20, 2026, Bac Ninh Province Is Officially Designated as Bac Ninh City

    Bac Ninh Province is officially designated as B...
  • Concentrating Efforts Toward the Target of Completing Nearly 160,000 Social Housing Units

    As part of the nationwide push to accelerate th...
  • Viglacera Continues Its Pioneering Mission for Green and Sustainable Development

    Viglacera Corporation – JSC was recently honore...

VIGLACERA REAL ESTATE COMPANY
Office: 2nd Floor, Viglacera Tower, No. 1 Thang Long Boulevard, Dai Mo Ward, Hanoi
E-mail: vir@viglaceraland.vn | Fax: (+84-24) 3553 7666 | Tel: (+84-24) 3553 6688
Website: www.viglaceraip.com

HOTLINE
+84 888252288 | +84 987708387
+84 903405099 | +84 888692288

© 2017-2026 Viglacera. All rights reserved. Designed by INNOCOM.

TOP

Zalo
Phone
All in one