ViglaceraIP

T: +84 888 252 288
  • Tiếng Việt
  • English
  • 한국어
  • 简体中文
  • 日本語
  • About us
    About us
    Main business
    • Building Materials
    • Real Estates
    International Cooperation
    Achievement & Awards
    Gallery
  • Project

    Project

    Industrial Parks
    Yen Phong
    Yen Phong 2C
    Tien Son
    Thuan Thanh Eco-Smart IP
    Song Cong 2 IP - Phase 2
    Dong Mai
    Hai Yen
    Phu Ha
    Phong Dien
    Tran Yen IP - Phase 1
    Dong Van 4
    Yen My
    Doc Da Trang
    Tien Hai
    ViMariel

    Factories for lease

    Housing project for workers

  • Investment Guide
    • Investment Guide
  • ADVANTAGES
  • NEWS
  • CONTACT US

North-South high-speed railway: Investing for the future

by Viglacera IP / Tuesday, 01 April 2025 / Published in News

In a short time, the National Assembly has issued three important resolutions to implement the North-South high-speed railway project; the Lao Cai-Hanoi-Hai Phong railway line and the development of the Hanoi-Ho Chi Minh City urban railway system.

At the evening meeting on March 29 of the Steering Committee for key projects and national important projects in the railway sector, Prime Minister Pham Minh Chinh emphasized the importance of investing in railway projects and developing the railway industry.

Of which, the North-South high-speed railway project has a total length of 1,541km from Hanoi to Ho Chi Minh City, with a design speed of 350km/h. The total preliminary investment is more than 1.7 million billion VND (about 67.34 billion USD). The implementation period is from 2025-2035.

The entire line is newly invested with a double gauge of 1,435 mm, a design speed of 350 km/h, a load capacity of 22.5 tons/axle; has 23 passenger stations, 5 freight stations; transports passengers, meets dual-use requirements for national defense and security, and can transport goods when necessary.

Regarding the North-South high-speed railway project, the Prime Minister requested to try to start construction in December 2026. He assigned the Ministry of Justice to give opinions on applying the simplified procedures in construction, and to issue a Decree on the overall design in early April; at the same time, ministries and branches promptly give opinions after the Ministry of Construction asks for opinions on the draft Decree.

Tagged under: Khu công nghiệp Viglacera, North South high speed railway, viglacera, viglacera industrial parks

Recent Posts

  • Viglacera Newsletter Q2 2025

    Viglacera Newsletter Q2 2025...
  • Finalizing the groundbreaking date for the Hanoi Capital region Ring Road No. 4

    Component project 3, construction of the Ring R...
  • Gia Binh Airport will be the largest in the North, Noi Bai Airport will be reduced in size

    On August 19, Bac Ninh province plans to hold a...
  • Viglacera is honored to be in the Top 10 ESG Green Vietnam Industrial Parks 2025

    At the announcement ceremony for the Top 100 an...
  • Viglacera Corporation – JSC organizes the 2025 annual general meeting of shareholders

    On the morning of June 10, Viglacera Corporatio...

VIGLACERA REAL ESTATE COMPANY
Office: 2nd Floor, Viglacera Tower, No.1 Thang Long Boulevard, Me Tri, Nam Tu Liem, Hanoi, Vietnam
E-mail: vir@viglaceraland.vn | Website: https://viglaceraip.com

HOTLINE
+84 888252288 | +84 987708387
+84 903405099 | +84 888692288

© 2017-2025 Viglacera. All rights reserved. Designed by INNOCOM.

TOP

Zalo
Phone
All in one
x
x