ViglaceraIP

T: +84 888 252 288
  • Tiếng Việt
  • English
  • 한국어
  • 简体中文
  • 日本語
  • About us
    About us
    Main business
    • Building Materials
    • Real Estates
    International Cooperation
    Achievement & Awards
    Gallery
  • Project

    Project

    Industrial Parks
    Yen Phong
    Yen Phong 2C
    Tien Son
    Thuan Thanh Eco-Smart IP
    Song Cong 2 IP - Phase 2
    Dong Mai
    Hai Yen
    Phu Ha
    Phong Dien
    Tran Yen IP - Phase 1
    Phu Ninh
    Dong Van 4
    Yen My
    Doc Da Trang
    Tien Hai
    ViMariel

    Factories for lease

    Housing project for workers

  • Investment Guide
    • Investment Guide
  • Advantages
  • News
  • Contact Us

GROUNDBREAKING OF THE HA NOI – QUANG NINH HIGH-SPEED RAILWAY PROJECT

by Viglacera IP / Monday, 03 August 2026 / Published in News

On April 12, the People’s Committee of Quang Ninh Province and Vingroup Corporation, in coordination with the People’s Committees of Hanoi, Hai Phong, and Bac Ninh, officially broke ground on the Hanoi – Quang Ninh high-speed railway project, which is expected to be completed by the end of 2028. With a maximum design speed of up to 350 km/h, the project will help shorten travel time between the two localities by 5 to 7 times, down to just about 23 minutes.

Prime Minister Le Minh Hung and delegates attending the Groundbreaking Ceremony of the Hanoi - Quang Ninh High-Speed Railway Project.
Prime Minister Le Minh Hung and delegates attending the Groundbreaking Ceremony of the Hanoi – Quang Ninh High-Speed Railway Project.

The Hanoi – Quang Ninh high-speed railway project is invested by VinSpeed High-Speed Railway Investment and Development Joint Stock Company (Vingroup) with a total investment of over VND 147,000 billion, equivalent to more than USD 5.6 billion (excluding site clearance costs).

The project passes through 4 localities: Hanoi – Bac Ninh – Hai Phong – Quang Ninh with a total length of 120.2 km. It is designed according to double-track standards, 1,435 mm gauge, fully electrified, with a maximum speed of up to 350 km/h, while the section through Hanoi has a maximum speed of 120 km/h. The project is expected to use the latest, most modern generation of high-speed trains along with world-leading signaling, communication, and equipment systems supplied by Siemens Mobility (Germany), which will gradually transfer technology to VinSpeed during operation.

The starting point of the line is located at Co Loa station (Vietnam Exhibition Center, Vinhomes Global Gate Hanoi Urban Area), and the endpoint is at Ha Long station (Globe Forest Park, Vinhomes Global Gate Ha Long, Quang Ninh). The route will pass through 3 transfer stations: Gia Binh (Bac Ninh), Ninh Xa (Hai Phong), Yen Tu (Quang Ninh), and will feature 1 depot located at the Ha Long terminal station.

Source: People’s Army Newspaper (Bao Quan Doi Nhan Dan)

Recent Posts

  • QUANG NINH – MOVES ONE STEP CLOSER TO BECOMING A CITY

    Conclusion No. 20-KL/TW dated April 7, 2026, of...
  • THE POLITBURO AGREES IN PRINCIPLE TO ESTABLISH CENTRALLY GOVERNED BAC NINH CITY

    On behalf of the Politburo, Standing Member of ...
  • VIGLACERA AFFIRMS ITS LEADING POSITION AS A BUILDING MATERIALS MANUFACTURER AND STRENGTHENS ITS FOOTPRINT IN INDUSTRIAL REAL ESTATE

    At an announcement ceremony organized by Vietna...
  • VIGLACERA 2026 ANNUAL GENERAL MEETING OF SHAREHOLDERS: PROMOTING GOVERNANCE, RENEWING CREATIVE THINKING AND ENTERING A NEW DEVELOPMENT CYCLE

    On the morning of April 25, 2026, in Hanoi, Vig...
  • VIGLACERA AND ROX LIVING SIGN A STRATEGIC COOPERATION AGREEMENT

    On May 6, 2026, in Hanoi, Viglacera Corporation...

VIGLACERA REAL ESTATE COMPANY
Office: 2nd Floor, Viglacera Tower, No. 1 Thang Long Boulevard, Dai Mo Ward, Hanoi
E-mail: vir@viglaceraland.vn | Fax: (+84-24) 3553 7666 | Tel: (+84-24) 3553 6688
Website: www.viglaceraip.com

HOTLINE
+84 888252288 | +84 987708387
+84 903405099 | +84 888692288

© 2017-2025 Viglacera. All rights reserved. Designed by INNOCOM.

TOP

Zalo
Phone
All in one